URGENT.
Pressure created by cut appearing on
far side means you must IMMEDIATELY
insert and tap in place a small QUARTER
SECTION WEDGE same size as the CUT SAW
DEPTH OF BLADE. Quarter section wedge
must be forced into the opening allowing
both sides to vent but keep from pushing
over onto next cut. ROV operator can
with help of CRANE lift slightly on the
riser bent pipe creating pressure on the
wedge then the diamond drill operator
can make a cut across the back following
the same curve which is blowing on the
other side.
After SECOND cut
across back another quarter or 1 eighth
wedge then you can change angle of the
saw and start toward the underneath
section with ROV paying attention to the
wedges or another person in the control
room watching the wedge for large
opening which would signal crane to
stand bye because it is shifting and
closing on wedges thus cut can continue.
Keep a little more
tension lifting the bent pipe section UP
which will allow the diamond round saw
to cut almost through with the crane
operator ready to MOVE cut length OFF of
the BOP area to the sea floor quickly as
all oil, water, mud and gas will not
escape out of the cut 21 inch riser
uncontrolled with full pressure. One
quarter wedges with stop points and
lanyards will stop the wedges from going
inside the piping.
Once the final cut
is made get ready with water pressurized
to push away the heavy oil, mud, gas
mixture and temporarily you could place
a larger pipe with 90 degree ell over
the pipe and blow the full oil and gas
away from the work area by turning same
held by crane in left or right direction
to keep flow away from bop for
inspection. Lifting UP slightly will
allow inspection with lights of the cut
area of the riser to see if it too is
bent or out of shape.
Frankly that would
be the excellent time to have that
Branko R. Babic Invention with flow thru
pipe just going inside riser pipe but
you will agree the depth is minimized
now with the cut so low but still it
might be something to look at IF you
cannot find the replacement Flange to
make up another when with the 90 and
pipe you can put the temporary diverter
over the cut pipe allowing you to even
consider cutting all bolts to the flange
if you can get another one rigged up.
JUST REMEMBER WHICH
BOLTS ARE INSERTED FROM TOP TO BOP WITH
NUTS AND WASHERS AND REMEMBER WHICH ONES
ARE BOLTS FED FROM BOTTOM PUSHED THROUGH
TO TOP FLANGE TO JOIN UP WITH NUTS AND
WASHERS OR SPACERS.
I have used the
WEDGE one quarter section forced into a
cut area to allow me to lift the bent
section slightly holding my wedge area
but still allowing flow then final cut
will release RISER and allow retrieval
of wedges with bent stop section like an
L shaped steel rod similar thickness as
cut by the diamond saw.
Roger. Will see
what else they can get TRAPPED trying to
cut stressed pipe from the side or
underneath. ROV operators are not
Construction Supervisors with stressed
pipe. Still believe the JUNK SHOT with
lead balls and even perhaps baseball
size steel would shut down the flow at
the bent section but NOW they have cut
the pipe and better have it held in
place by two cranes or it will PEEL
really destroying the riser section all
the way down into the FLANGE. Why they
will not get a new flange from the BOP
manufacturer and cut the other one loose
then swing the new flange over and lower
down….is beyond me.
They need to put
professional contractors in a meeting
with ROV operators to introduce them to
cutting stressed pipe and even how to
cut pipe on supported surfaces using
cranes to hold pipe and pick up or
remove pipe with slings properly to
prevent injury to personnel or equipment
at any depth.
I watch
occasionally BUILDING BIGGER where they
build Liquid Natural Gas tanks and we
even welded sections in Mulberry of some
similar rigs where the crane operators
really got my respect as a
Boilermaker/Welder with Local 433 in
Tampa. The USCG have perhaps a similar
group of ratings like machinist mate and
boiler tech who could tell Rear Admiral
Landry to check with the SEA BEES and
also U.S. Naval Divers on such cutting
methods as they repair ship items and
special underwater pumps no doubt.
I remember clearly
talking with Irrigation Contractors
pulling water from 1,000 feet down for
sprinklers and fire sprinkler systems
using special filters on the bottom
under the submersible pump to keep trash
out while they pump the water UP to the
surface where tanks store it and pump it
higher for use on Fire or Irrigation
sprinklers. Cutting in to my ideas is
training and experience working with
these State Certified and Licensed
Professionals since 1974 in Florida.
We were watching
the ROV with cut saw failing to get
clean cuts and felt sorry for the ROV
operator who did not obviously have a
Contractor qualified with such a saw in
the control room seated beside him. NO
CUTTING AND NO CRITICAL WORK SHOULD BE
DONE OR ATTEMPTED WITHOUT SPECIAL
ADVISERS LICENSED FOR UNDERWATER CUTTING
OF SUPER HEAVY LONG SECTIONS OF STEEL
RISER PIPE AS THIS SHOULD BE MANDATORY
THAT THE ROV OPERATOR LISTENS TO THE
PROBLEMS OF SUCH CUTS AND SHEAR BLADE
BEING ON THE UNDER SIDE OF A STRESSED
PIPE GROUP OF RISERS WAS ACTUALLY STUPID
AND DANGEROUS AT 5,000 FEET AS THEY
WOULD HAVE TO USE DIAMOND WHEEL CUTTERS
TO FREE THE UNIT TO GET IT BACK TO THE
SURFACE UNTIL OXY-ACETYLENE UNITS COULD
CUT AWAY THE JAMMED PIPE WHEN IF THEY
WOULD HAVE PUT THE BLADE ON TOP AND
SUPPORTED THE CUT WITH CRANES HOLDING
FAST PULLING UP ON THE PIPE GOING TO THE
SEA BED YET ANOTHER CRANE HOLDING THE
BENT RISER PIPE BEFORE THE CUTTER WOULD
HAVE CUT IT IMMEDIATELY. CRANE WOULD
HAVE TO PULL THE PIPE UP AWAY FROM THE
LINES HOLDING THE HYDRAULIC CUTTER AS IT
WOULD BE TRAPPED WITH A FALL ARC WHICH
MIGHT CAUSE DAMAGE EVEN TO THE BOP
CONNECTION THAT NO ONE COULD SEE.
Sort of
unbelievable for me to watch feeble
attempts more than three times resulting
in jammed teeth cutting wheels then the
hydraulic shear pushed over to cut from
the bottom on a stressed section.
Any County Worker
with the Utilities Department or City
Utilities specialist with steel water or
air pipe could advise the USCG personnel
and be sitting on the ROV ship with the
ROV operators telling them first what to
expect from tension of steel that long
that deep. Then they would stay with
the ROV operator and guide him cutting
away sections of pipe away from the
riser bend to the sea bed. Trying three
or four cuts on the sea bed but again
remember that suggestion about putting
water under pressure through fan spray
to keep the vision clear between ROV and
work. Once you cut the RISER off the
sheer weight of the escaping OIL will go
up and then come back in a blob over the
BOP unless you blow it away and once the
cut is clean have a crane with a close
fitting 45 degree ell short section of
pipe, even flanged, then second 45
degree ell and straight section of pipe
perhaps 20 feet long to take the flow of
everything away from the work area until
totally ready to work. You can attach
any short smaller pipe reducer on the
pipe and take the oil, gas and water UP
to the surface but primarily you are
trying to push the vision obstruction
material away from the work area.
Once you are ready
to remove the FLANGE and move over with
another crane with the flange at BOP TOP
level in the water undisturbed ready for
mating with the new BOP FLANGE FEMALE
then the bolts can be tack welded going
DOWN already and once placed properly
the ROV can use the socket with nuts and
giant washer perhaps to lock it down
with another round shutoff valve up
toward the surface on that flotation
rigged riser now connected to the BOP.
My concern is everyone will forget to
attach the CHECK VALVE keeping all
hydraulic oil inside the lines with a
connection to VENT salt water and debris
out of the hydraulic line somewhere on
the BOP. AGAIN READ THE MANUAL AND
CONTACT THE MANUFACTURER AS THIS
CONTAMINATION MUST HAVE HAPPENED IN THE
PAST !
I am betting
heavily on the KILL VALVE AND CHOKE
VALVE FORCING LEAD BALLS until the TOP
BENT RISER SECTION STOPS FLOWING…..that
gives you time to regroup, make a new
TOP FLANGE, weld bolts if necessary,
insert check valve and be ready to put a
shutoff valve on the riser pipe then
rejoin all five LINES welded perhaps by
GE in a shop with special flotation over
all areas then give you special
flotation rated pipe to go to the
surface and at say 200 feet have another
shutoff on a flange to flange with
bypassed hydraulic and mud lines…..GET
THE PICTURE !
Florida is in
danger and the United States may take
10-20 years to recover from this
NATIONAL DISASTER which no one would
take command and shut down the BOP or
stop the leaks when we all now know it
is solvable within 8 hours by a good
machine shop with full specs designing a
BOP TOP FLANGE and inserting a new one
then going on with all of our lives and
using those deep water SUMPS,
SUBMERSIBLE PUMPS, SUMP PUMPS FOUND IN
LIFT STATIONS AND SKIMMERS WHICH CAPTURE
ALL LIQUID AND WATER FOR 24 INCHES DOWN
IN THE WATER FORCING IT UP INTO A
SECTION OF PIPE WHERE IT FLOWS INTO A
BARGE ENTRY POINT TO BE SEPARATED AND
WATER PUMPED BACK IN SEA CLEAR WITHOUT
ANY OIL.
Inventions are out
there to use long MATS of special
material to pull water and oil into the
barge, squeeze out the oil and send the
mat back down into the mess plus skim
oil like one uses a dustpan forcing it
over sand stacks so the water goes on
through and is pumped away then the oil
pushed into a barge and when it get full
another barge comes into the picture and
the routine goes over and over with
barges going out to deep draft barges to
unload OIL and come back for more.
Those Cute LANDING CRAFT can be equipped
with skimmers and load all oil and water
into landing craft to be taken to VACTOR
units which separate the oil and water
like the local ROTO ROOTER vacuum/vactor
trucks but super powerful suction units
pulling oil deep from the ocean up into
a barge. VAACTOR TRUCK PULL LIFT
STATION CONTENTS UP INTO A HOLDING TANK
ON A TRUCK THEN IT IS TAKEN AND DUMPED
INTO A BARGE PERHAPS. OVER AND OVER
….BUT THE OIL WILL BE PICKED UP BY THE
SUPER SUCTION AND WATER FALL AWAY OVER
SPECIAL MATS OF MATERIAL WHICH RUNS TO
ROLLERS AS THE WATER RUNS THROUGH THE
MATERIAL…….PICTURE IT !

All CITIES,
COUNTIES AND EVEN U.S. GOVERNMENT
INSTALLATIONS HAVE THESE!
SPECIAL SUMP PUMPS
AND GRINDER PUMPS IN LIFT STATIONS CAN
PULL ALL
OF THE OIL FROM
DEEP WATER UP TO THE SURFACE BY JUST
HAVING RIGS LOWER
PIPE WITH PUMPS IN
SHEDULE 900 PVC MOVED AROUND AND TURNED
ON SUCKING
OIL UP OFF THE AREA
JUST ABOVE THE SAND INLAND RECOVERING
ALMOST ALL
PATCHES. CHECK
IT OUT WITH A 55 GALLON DRUM OF OIL
PICKED UP ! IT WORKS!
The EPA or DEP has
a manual of exactly how to build these
things called skimmers….. I prefer to
use ROOTO ROOTER TRUCKS ON BARGES
SUCKING EVERY OUNCE OF OIL WITH SKIMMERS
INTO THE BARGE !
Centrifuge spinning
of water through slits covered with
fabric and OIL flowing down to another
section where it is moved into a BARGE
even if you have to squeeze rollers is
an option. Me I would think the GIANT
MAT OF SPECIAL ABSORBENT MATERIAL WHERE
THE OIL STAYS IN SAME AND ROLLERS
SQUEEZE IT INTO TANKS like an assembly
line material on rollers is an option
worth consideration as the material will
keep running over and over while the
water is thrown off on the curve like a
roller coaster running at Disney or
Busch Gardens. The MAT material holding
the oil would go through rollers fast
enough but the sudden turning at 90
degrees fast would throw water off of
the surface into channels to send it
back to the Gulf. Such would allow ALL
SKIMMERS to function and recover perhaps
98 percent of ALL OIL SKIMMED ! Check
with the professionals Rear Admiral
Allen. Even super FANS can blow with
blowers across the oil soaked matting
before it heads to the rollers and all
water would be sent through special
slits into channels to the sea without
OIL.
I am sure the KEVIN
COSTNER CENTRIFUGE would work but to me
the old shallow draft Flat Bottom
AIRCRAFT ENGINE “AIR BOATS” USED TO SKIM
THE EVERGLADES CAN BE BROUGHT UP AND
USED AT SEA TO SKIM THE MARSHES AND
THOSE ENTIRE FRONT SKIMMER UNITS LOOKING
LIKE DUST PANS REACHING 12 INCHES BELOW
THE SURFACE CAN COLLECT A LOT OF OIL AND
PUSH IT INTO THE TANKS WHERE PUMPS
TRANSFER OIL AND WATER TO ASSOCIATED
BARGE CARRIED BEHIND SAME TO GIVE THE
BARGE TO ANOTHER LARGER BARGE OFF THE
SHALLOWS THEN GRAB ANOTHER COLLECTOR
BARGE BEHIND THE ODD FLAT BOTTOM BOAT
USED IN THE EVERGLADES AND ONLY
REFUELING WOULD BE NECESSARY. To think
of not using these flat bottom GIANT
PROPELLER ”AIR” BOATS FROM THE
EVERGLADES is unbelievable as they can
be brought from all lakes, rivers and
streams on flat cars the put into
service in marsh lands with those 40
channel CB Radio’s with magnetic mount
antennae assigned specific call signs
and channels staying off channel 9 and
channel 19 for this work with support
refueling vessels and barges plus these
can be used with or without extra
personnel.
It is now after
Midnight so Ralph must retire and sleep
to dream of new ideas perhaps.
Ralph
060310 2 12:42 AM
Eastern
Ralph Charles
Whitley, Sr. CFCO32631
Backflow Prevention, Inc.
4532 W. Kennedy Blvd. PMB-276
Tampa, Florida 33609-2042 USA
Phone: 813-286-2333
SCRIBD: ralphwhitleysr
Rear Admiral
Landry:
I do not have to
draw a picture of a 90 foot super heavy
straw sticking out of the earth nor do
you need a picture of a 20 foot straw
super heavy over the side of the BOP
crimping the short RISER.
CHOP SAW with
Hydraulic Blades should cut away the
STRAIGHT four steel line section close
to the Flange bent RISER FIRST then you
could control any cut directly over the
flange. CUT FROM BACK SECTION 180
DEGREES on riser AFTER you get the
weight OFF. Such means the Crane MUST
hold or even pull UP on some pipe and
this is solved by cutting near the crane
line as they hold back from the surface.
Remember the vessel
is going UP AND DOWN slightly so when
you decide to cut HYDRAULIC BLADE MUST
START AT TOP PIPES GOING AWAY FROM THE
BENT RISER ONLY CRUSHING DOWN AND
SLICING OFF PIPE WHICH IS HOPEFULLY HELD
BY THE SECOND CRANE and the pipe will
fall loose then controlled by CRANE 1 on
the BOP side of the cut, all will be
held.
Then take the
HYDRAULIC BLADE CUTTER and cut another
section of pipe some 3 feet or so from
the BOP RISER BEND….such will allow you
to have nearly NO pressure on the RISER
BEND and you can use the DIAMOND SAW to
make three slices….One half way
down….down from the top bend measuring
perhaps on a chart 45 degrees letting
the back of the stressed section open
up. Such will allow the same small
section to be pulled on slightly by the
crane operator with tension straight up
thus allowing the diamond cutter from
Oceaneering to make another cut while
flow of gas and oil is no restriction on
the other side.
Who gives a darn
about whether the cut is perfect as you
CLEAR THE WEIGHT PULLING DOWN ON THE
BEND then you can rotate the saw around
the riser at will cutting 2 inches deep
all around to make it smoother right
through the 90 degrees, move over on the
other side and cut 90 degrees only then
move with Crane holding riser above cuts
to cut the third 90 while you have
pulled out and there is only one cut 90
degrees to make with crane holding or
pulling up opening the cut. Later the
bottom near flange cut can be done the
same way and nothing will bind the
diamond saw from Oceaneering. Such
will help Oceaneering in any future work
as they are not realizing the pressure
pulling pipe ruptured over will jam the
saw and no one ever called Underground
Utility Experts let alone Plumbing
Contractors who have faced such
conditions on land or shallow water.
Depth is no problem if you realize the
surface vessel with CRANE is MOVING.
Stop thinking about
5,000 feet. You have an 8 story
building with bent heavy pipe bending a
21 inch riser. Cut away all pipes
except that directly over
flange….releases weight. Make stupid
odd cuts in V formation but release the
bad bent pipe just above and below the
bend. Make a cute perfect cut of the
other half near the flange later and
trim it later….right now get the weight
away and see how silly it is not using
WATER HOSES to push the flow away and
where is the two 45 degree ell units you
are going to lower over same….much like
lowering a bent PVC PIPE over a
sprinkler in your yard folks…… Duhhhhh
? It will remove the flow of oil and
gas from the work site allowing you to
have a funnel effect until you get your
cut cleaner.
Remember Branko R.
Babic Counter Pressure Plug with shutoff
and flange going above the BOP. MAKE
ONE IN THE WELDING SHOP as a sample,
check it and remember the SLEEVE idea
which will be pressed OVER the damaged
riser even 2 feet will work. WHAT DO I
KNOW EH ?
Had you advised the
ROV operator didn’t have an underground
contractor or utility contractor on
SKYPE talking to them perhaps this
entire event taking minutes is now
taking super HOURS. NO CUT…. Garbage
as BP cannot get a clean cut with
Diamond Saw with pressure and oil
pushing once you attempt to cut straight
across….make three cuts joining then
trim it perfect later folks..
Ralph
060310 @ 10:13 AM
Eastern
NEED SOME OF MY
SKYPE TIME TO MAKE A CALL EXPERTS ?
Rear Admiral Landry
and others including Oceaneering:
Since 042610 Ruth
DeLaMater Bundy and I have attempted to
get information across to BP and others
making the decisions that the SECRET TO
STOPPING THE LEAK AND RECOVERY OF ALL
OIL AND GAS WAS KNOWN. Sadly no one
reviewed material with the TRUE EXPERTS
who work in similar leak problems ALL
OVER THE WORLD !
Keep this in the
back of your mind: The FLANGE TOP
section of the BOP connection could have
been cut away long ago had you removed
the piping pushing down on same and
pulling.
Now that the FLANGE
is clear, the BOP manufacturer must have
had one or plans to make on somewhere on
the Planet that could be made in a big
machine shop with all holes and piping
to allow the GE FLOTATION 21 INCH RISER
to be connected in hours to the TOP of
the BOP by the new flange with shutoff
and female flange above shutoff. Oddly
the use of a NEW flange only had to
result in Oceaneering CUTTING away the
bolts connecting the present flange,
removing same and crane lowering the new
flange onto the BOP with a perfect seal
that could not leak.
Alternate was clean
cut perhaps 3 feet above the BOP flange
then insertion of the Branko R. Babic
Counter Pressure Plug vertically sealing
the flow and allowing BP to draw off a
large amount of oil, gas and water
perhaps to the surface and any emergency
would allow shutting down the rig BOP
forever.
Here I observed the
piping cut away, no attempt to make a
clean cut around the riser which may
indeed be damaged ….the reason why we
recommended getting another FLANGE to
connect pipe and a shutoff above same.
BP, TRANS OCEAN AND
WHOMEVER never listened about making a
large pipe just barely tapered inside
thick wall pipe going down over the
FLANGE FOR A PERFECT MATCH AND SEAL as
special material could be like a giant O
ring inside sealing perfectly against
the TWO existing FLANGE SURFACES with
special threaded rods using tapped BOLT
screws tightened against the bottom
FLANGE steel holding everything in place
but allowing a full bore perhaps 36 inch
pipe with shutoff toward the surface to
hook up with the neat GE 21 inch
Flotation pipe. NO LEAKS AT ALL.
Instead the
SOMBRERRO type unit will leak as it
cannot match up with the riser now bent
and damaged extending out of the top
flange mainly because the sealed
compartment will not match up perfectly
and machined to seal on the top of the
top flange. Thus WEEKS OR MORE will
have leaks all over the Gulf not being
able to stop same when the solution was
given but not from an expert hired by BP
or College Professor looking in a BOOK
but from a State of Florida Certified
Plumbing Contractor with too many years
experience with water, gas and
sewage….all which would work at 5,000
feet by well qualified crane operators
and well qualified ROV operators.
I really appreciate
the Courtesies shown an Old Decorated
American Veteran by the various
Lieutenants with the USCG and lower
enlisted who have talked with me in the
past via internet and phone. I am
shocked the DAMAGE CONTROL SPECIALIST OF
THE NAVY SHIPS AND SUBMARINES DID NOT
GET COUNSELED ON HOW TO SOLVE THIS LEAK
EVEN THOUGH THE OUTSIDE DIAMETER OF THE
FLANGE MIGHT BE 36 INCHES….THEY DO MAKE
THICK WALL 36 INCH PIPE WHICH COULD BE
WELDED ON SURFACE LOCATIONS TO GIANT
HEAVY WHEELED VALVE OR EVEN THE “MEGA
FLANGE CONNECTORS” SUCH AS SERIES 2100
Someone really
needs to look at the Branko R. Babic
Counter Pressure PLUG which would STOP
all flow or the CPP with flow through
Pipe which could work in 2 feet of riser
which is obviously there. My money would
have been on a NEW FLANGE or putting
that Super Thick STEEL PIPE OVER THE
FLANGE machined to seal against the
PERFECTLY ROUND AND PERFECT TOP CUT ON
THE TOP FLANGE WHERE THE RISER IS COMING
OUT. It would be OBVIOUS machine
grooving or cutting of the thick wall
pipe to critical bevels would have
allowed a welded shutoff and also
attachment of a reducer welded with
flange to accept the GE pipe then YOU
WOULD NOT HAVE ANY LEAKING OIL as the
free section over the second flange
would have super tapped holes with super
bolts perhaps 2 inch holding unit to the
bottom FLANGE while the pressure above
the pipe would consist of weights much
like giant circular weights of a weight
lifter bar before the shutoff wheeled
gate valve and short pipe with reducer
and flange for 21 inch flotation riser
pipe.
INSTEAD
OF USING THE OBVIOUS SOLUTION now BP,
with full permission of the President
and USCG will unleash a leak into the
GULF risking more damage, attempt a
DRILL into the CASING 7” TO 36 “ AREAS
ACTING AS A RISER which is dangerous to
SHUT DOWN THE WELL ? OR DRAW OFF THE
DEEP WELL CONTENTS INTO ANOTHER RISER
WITH UPRIGHT BOP WHICH COULD FAIL IN THE
FUTURE AS THEIR RISER PIPE TO THE NEW
WELL CASING DRILL IS STILL NOT FLOTATION
GE PIPE AND THE NEW BOP WILL BE STRAIGHT
UP WHEN IT SHOULD BE LYING ON IT’S BACK
IN THE GULF FLOOR WITH TEE HAVING
SPECIAL SHUTOFF VALVES.
NO ONE
USED ANY MACHINED BEVELED 12 INCH WASHER
WITH FLOW THRU PIPE WITH OR WITHOUT
SLEEVE THEN PUSHED TWO FEET INTO THE BOP
FLANGE TOP TO MAKE A PERFECT
SEAL….ACTUALLY THE RISER IS WEAKENED AND
MAY REALLY BE A PROBLEM BUT THEN A
REAMER COULD REAM THE PIPE INSIDE THE
FLANGE AND A COUNTER PRESSURE PLUG COUL
HAVE SHUT OF THIS WELL IN 8 HOURS FLAT
FOLKS……BP WANT’S THE FLOW OF OIL AND GAS
AND ALSO DESIRES TO PUT IN ANOTHER DRILL
RIG TAPPING ON THE SIDE OF THE PIPE
CASING FOR DEEPWATER HORIZON AND THIS
COULD BLOW OUT REALLY BIG BUT AMERICA
MUST TALK TO PEMEX ABOUT IXTOC 1 IN
1979….AS THE SAME PLAYERS WERE THERE AND
LEARNED NOTHING.
FOR MY MONEY I
WOULD USE WHAT WAS DISCUSSED, SAVE THE
MILLIONS ON MAKING A RELIEF WELL AND GET
THE OIL AND GAS UP FROM THE BOP TOP !
But that is me ! NOT YOU OR NOT MY
PRESIDENT !
GOD HELP AMERICA AS
BP DOES NOT HAVE THE SAME DESIRE TO
SECURE THE LEAK, ONLY PULL OFF THE OIL
AND THEY FAILED WITH IXTOC 1 AND WILL
FAIL WITH THIS WELL AT THE COST OF THE
AMERICAN PEOPLE……..IS THAT WORTH IT MR.
PRESIDENT ?
I will NEVER post
again unless invited by the President OR
Rear Admiral Landry then ALL OF YOU will
not be copied unless directly from the
President OR Rear Admiral Landry.

Ladies and Gentlemen: ARE YOU REALLY
THAT STUPID ?
|
Size
in. |
O.D.
in. |
B.C.
in. |
T
in. |
Bolt
Hole
Diameter
in. |
Bolts |
|
No. Per
Joint |
Size
in. |
|
24 |
32 |
29.5 |
1.88 |
1 3/8 |
20 |
1 1/4 x 5 1/2 |
|
30 |
38.75 |
36 |
2.12 |
1 3/8 |
28 |
1 1/4 x 6 1/2 |
|
36 |
46 |
42.75 |
2.38 |
1 5/8 |
32 |
1 1/2 x 7 |
I went to
sleep for three hours and woke up with a
frightening thought watching CNN show
the odd cut riser and BP indicating the
leak may be there until December 2010.
I
sincerely HOPE someone really WALKS
OUTSIDE THE COMMERCIAL OR GOVERNMENT
BUILDING and asks Maintenance to show
them the LARGEST BACKFLOW ASSEMBLY and
once found looks at the FLANGE
connections and thinks for one moment
about how to get a PERFECT SUPER TIGHT
SEAL OVER ANY FLANGE. Keep this in
mind. 21 inch riser OD OR ID may mean a
24 inch SUPER SLICK AND FORMED FLANGE
LEAVING PERHAPS 1 inch ALL AROUND SLICK
TOP FOR CONTACT WITH THE SO CALLED TOP
HAT THAT SOME IDIOT THOUGHT THEY WERE
GOING TO PUT OVER THE BENT 21 INCH RISER
WITH THIS LATEST SOMBRERO 5 UNIT. BP
admitted there were going to be LEAKS
simply because no one made a SKYPE CALL
OR LONG DISTANCE CALL TO FLORIDA OR
CHECKED WITH THE U.S. NAVY OR U.S. COAST
GUARD DAMAGE CONTROL EXPERTS. Follow
with me for a moment. Size OD for a 24
inch FLANGE is 32 inches with Bolt
diameter 1 and 3 eights taking 20 bolts
1 and 1 quarter X 5 and 1 half.
Obviously NOT the perhaps 8 bolt FLANGE
shown but do not give up…… take a 28
inch LENGTH OF 34 INCH PIPE WITH THICK
WALL STEEL OBJECT ROUND.
FIRST --- DRILL OUT A 22 INCH INCH HOLE
OR WELD A 22 INCH THICK WALL PIPE TO
THIS HOLE SO YOU CAN ATTACH A WEIGHT
OBJECT AND HAVE A FLANGE ATTACHED
ALLOWING AN UNDERGROUND WHEEL CONTROLLED
GATE VALVE .
SECOND--- TAKE THE 22 INCH HOLE OBJECT
WITH 22 INCH WELDED PIPE OVER TO A
MACHINE SHOP IMMEDIATELY THEN USE THE
LATHE TO CUT OUT A 32 INCH OD CUT SOME
12 INCHES DEEP INSIDE ALLOWING THE
INTERIOR TO JUST CLEAR THE 32 INCH
FLANGE BY MILIMETERS BUT ONCE IT
CONNECTS WITH WEIGHT IT WOULD MAKE A
PERFECT SEAL ON THE UNDISTURBED FLANGE
LIKE YOU LOOKED AT OUTSIDE THE BUILDING.
THIRD --- TAKE THE NEAT DONUT MODIFIED
OUT OF THE LATHE JAWS AND ATTACH GIANT
WEIGHTED BARBELL WEIGHTS PERHAPS 8 FEET
IN DIAMETER AND 4 FEET THICK THEN ON TOP
OF THAT AREA WELD YOUR SUPER HIGH
PRESSURE GATE VALVE AND BEYOND THAT MAKE
UP THE FLANGE TO ATTACH TO THE GE RISER
PIPE.
FOURTH --- USE SPECIAL GASKET MATERIAL
ALLOWING THE 22 INCH RISER HOLE TO BE
MACHINED OUT UNDERNEATH TO THE PRECISE
AREA TO BE SEALED ON THE FLANGE RIM
WHERE IT WILL CLEAR ALL BOLTS AND NUTS
LEAVING AT LEAST 2 INCHES PERHAPS FOR
THE RIG TO SET ON WITH SUPER WEIGHT LIKE
A WASHER SEALING THE OIL AND GAS LEAK
AND ALLOWING BP TO BE CHECKED
IMMEDIATELY BY THE STOELTING
ULTGRASCRIBE POLYGRAPH 8 CHANNEL LAPTOP
BECAUSE IT WOULD APPEAR YOU HAVE TRUE
TERRORISTS WITH SUPER MONEY BACKING IN
YOUR MIDST.
EVERY FORMER NAVY MAN GOING THROUGH
DAMAGE CONTROL TRAINING OR EVERY
UNDERGROUND UTILITY AND STATE CERTIFIED
PLUMBING CONTRACTOR ALONG WITH FIRE
PROTECTION CONTRACTORS KNOW YOU CAN
QUICKLY MACHINE ANY THICK ROUND STEEL
OBJECT CUTTING OR BORING A HOLE
PERFECTLY IN SAME, HOLDING IN A MACHINE
LATHE MAKING SURE THE HOLE IS PERFECT
INSIDE AND OUTSIDE THEN CUTTING AWAY 12
INCHES OF METAL ALLOWING A PERFECT FIT
OVER A FLANGE THEN UP 12 INCHES INSIDE
THIS HUGE WASHER ONE WOULD MACHINE
OUTWARD PERHAPS 1 INCH BY 4 INCHES TO
ALLOW PERFECT CONTACT WITH THE FLAT
UNOBSTRUCTED SURFACE OF THE FLANGE
MAKING A PERFECT SEAL.
FIFTH ----- The block could have bottom
2 inches of the 12 inches bored all
around with holes which would be tapped
and allow bolts to protrude turned by
ROV or socket or BOX WRENCH clamping
down on the bottom flange to hold it in
place securely.
Earlier this old Veteran told you to get
another BOP flange for the top ready.
NO ONE CARED TO CHECK with the
Manufacturer on the exact measurements
of existing BOP flanges which might be 6
inches thick for each Flange and a
specific OD which is NOT illustrated
above folks. The BOP flange will be
perfectly ROUND and smooth with at least
2 inches perhaps of clearance from the
outside of the flange to the first
contact with a BOLT and THAT IS YOUR
TARGET to set something like the SEALED
TOP HAT SIX which will not only seal but
have sufficient weights to prevent it
being raised as you have flow thru
BRANKO R. BABIC Counter Pressure PLUG
idea incorporated and instead of placing
OVER a pipe you place the unit OVER A
PERFECTLY SMOOTH FLANGE which is GOD
SEND IN DISGUISE!
HOW
MANY BP EXPERTS DOES IT TAKE TO SCREW IN
A LIGHT BULB AT A DESK LIGHT ?
IN
MEMORY OF DR. MASON TRUPP FORMERLY OF
TAMPA GENERAL HOSPITAL THE INVENTOR OF
THE MILITARY JET PILOT “G” SUIT WHO
INDICATED IN 1979 NOT TO GIVE UP UNTIL
YOU TALK TO THE HIGHEST PEOPLE IN
GOVERNMENT WHEN YOU HAVE AN IDEA OF
NATIONAL SECURITY !
Rear
Admiral Landry --- You can have anyone
go to CAMERON the manufacturer of the
BOP to get the exact OD, thickness and
CLEARANCE IN INCHES from the rim of the
Flange to any contact with a bolt or NUT
which leaves plenty of room to shut this
nightmare down. ALL YOU NEED is to have
a flat seal and the water department can
share what they use in County or City
departments for that task which is like
a special washer used inside backflow
assembly components using flange to
flange connections. THAT can be placed
carefully OVER the flowing pipe and be
waiting on the TOP of the flange to seal
with the inside cut for that same
purpose and THERE WILL BE NO LEAKS of
any air, water or GAS.
PAINT THE DARNED THING RED, WHITE AND
BLUE FOR OUR MILITARY PAST AND PRESENT
PLUS FUTURE PLEASE !
Remember the PAINT will not last long
but neither will my TRUST in BP who seem
to be terrorists of the worst kind right
now !
Professionally,
Ralph Charles Whitley, Sr. CFCO 32631
Backflow Prevention, Inc.
Backflow2@Verizon.net
060310 5:57 PM Eastern or 10:57 PM
Oxford England.
http://www.scribd.com/ralphwhitleysr
JUNE 4, 2010
MAYDAY TWELVE --- ARE YOU REALLY THAT
STUPID SO CALLED EXPERTS ? --- DO YOU
KNOW WHAT SMOOTH SURFACE IS ON A 32 or
36 INCH FLANGE --- How many BP Experts
does it take to Cause a National
Disaster for MONTHS ?
JIM:
See
Mayday 12, go outside and look for the
fire protection Backflow Assembly
possibly 8 or 10 inches in diameter.
Check with a ruler and tell me how many
inches clearance on that smooth surface
and think of machining a seal based ONLY
on the smooth flange. WHO IS RUNNING
BP ? Anyone knows how to stop this and
seal it with special flat material in
that 1 or 2 inch space so the machined
object can be forced down on it….forget
the riser as it is damaged.
PASS
IT ON !
Ralph
Brad
Et Al:
SUPER NATIONAL DISASTER
DEFCON 5
ALL OF AMERICA, ISLANDS,
EUROPE AND POSSIBLY RUSSIA, CHINA AND
OTHE ISLANDS IN DANGER NOW
PHONE A FRIEND USED UP
FIFTY FIFTY USED UP
DOUBLE DIP USED UP
HEY----LET’S ASK THE
EXPERT VIA SKYPE—NO SKYPE USE QUARTERS
OR A PHONE !
Now
you know NOW why we recommended
Oceaneering to the U.S. Coast Guard Rear
Admiral Landry to cut the pipe. It was
unexpected that someone would use a
hydraulic shear cutting on stressed
downward pipe from the bottom jamming
same but fortunately they got it to
release. I have done the same thing
with PVC SHEAR CUTTERS so they do not
have the Patent on stupidity as I got
that patent YEARS AGO.
We
also warned Rear Admiral Landry about
the cut saws with teeth being used to
cut from the bottom or stressed sides
and had no idea someone would attempt a
cut below the bent section of the riser
FIRST before freeing the top with a V
cut then positioning the diamond bit
wheel on the flange to cut first half
way around then re-position and cut the
last half with crane supporting
pipe……even recommended a WEDGE ONE
QUARTER in two places for the cut to
stop any crimping and give them a good
cut that might have sealed had someone
been thinking of using an overlapping U
steel bent cap which had a way of being
forced over the riser…..NO ONE
CALLED…RAN OUT OF QUARTERS ?
Remember one item. Hydraulic STEEL
Sections could have clamped down on the
bent riser then LEAD BALLS could have
been forced into the Choke Valve and
Kill Valve lines going UP to the flange
stopping ALL FLOW of everything and
filling the entire void below the crimp
to the Flange FOREVER. I am not a fan
of STEEL BALLS but there are many out
there in the giant equipment industry
which also could be used for the KILLING
of the riser flow but lead would spread
out in pressure and form a better seal
IMHO. Notice NO ONE FROM BP or NO
EXPERTS could see the forest right
behind the trees so instead someone
didn’t even think of crushing the
damaged riser and a JUNK SHOT of lead
balls. Gee….not enough sleep since
April 20 OF 2010 ?
SUPER NATIONAL DISASTER
DEFCON 5
ALL OF AMERICA, ISLANDS,
EUROPE AND POSSIBLY RUSSIA, CHINA AND
OTHE ISLANDS IN DANGER NOW
Sadly the LMPR or Top Hat was NOT made
thinking about the FLANGE sealing
option. BP and the great EXPERTS also
forgot that perhaps Cameron had another
FLANGE topside on the Planet for the
model top exit straight flange STATS and
DRAWINGS must be somewhere. Cameron may
even have one laying DOWN in a warehouse
somewhere to send by BLIMP over to
another customer thus the NEW flange
could have been supplied and that cute
NON FLOTATION piping, adding a check
valve for hydraulic oil, could have been
incorporated with a FLANGE TO FLANGE
SHUTOFF on the TOP flange before using
FLOTATION ONLY RISER FROM GE as shown on
Drilling Ahead Dot Com site about
Deepwater Horizon Explosion.
Before I risked a BLOWOUT
under the 36 inch Casing it would indeed
be CRITICAL for BP or USCG to get the
true dimensions of the BOP top Flange
then make a simple MACHINED sleeve to go
over both flanges with another machined
seal setting down on the clear flange
surface which must be 2 or 3 inches with
special fiber seal and weighted items
with shutoff from Branko R. Babic
patented idea from 1991. ROV can pull a
special fiber seal through the muck and
gas to place carefully on the perhaps 2
inch area of the flange where the
machined seal would set.
WARNING --- ALL FUTURE
BOP INSTALLATIONS SHOULD BE WITH TEES
HAVING SHUTOFF VALVES PLUS LYING DOWN
THE BOP ON THE SEA FLOOR AND A 90 WITH
SHUTOFF AT THE TOP OF THE BOP TOWARD
SURFACE. You know why now !!!
Special THICK SOLID STEEL SLEEVE
properly machined to fit tight over one
especially with extra cut section below
special flange seal and top flange
critical side measurements then the
second section can be a little loose
over SECOND FLANGE which may be off one
half inch maximum but we need that
surface to tighten BOLTS holding this
thick sleeve tightly to keep it from
pulling off PLUS allow giant bolts to be
turned using tapped holes in the new TOP
HAT bottom, which may be 12 or 14 inches
long and over 3 inches thick.
HEY EXPERTS then this
would mean the TOP HAT FLANGE SEAL would
hold down and with weights pressing down
make a perfect……..P E R F E C T ……seal
on the Flange. The Branko R. Babic
Counter Pressure Plug SLEEVE WITH BOLTS
FOR SECOND FLANGE design would have the
welded heavy steel riser fitted into the
center cutout for same FLOW THRU USE
then above that would be the super
weights also welded onto the thick wall
riser AND WELDED TO THE TOP HAT SEAL
FLANGE SURFACE then finally a circular
wheel gate valve and short section of
super heavy thick wall riser perhaps 21
inches to the flange which ODDLY would
match up to the GE Flotation RISER which
would have zero weight with special
flotation at 5,000 feet thus no pressure
to NOT connect to the surface.
GEE MR. AND MRS. EXPERT.
I can see it coming to my mind….hand me
one of those thick wall SOCKET SETS and
let us look at the possibilities FOR
THIS IS SIMILAR AND I CAN WELD A PIPE
PLUS WEIGHTS ON TOP OF ALL AS THEY ARE
STEEL. PAINT THEM RED, WHITE, BLUE FOR
OUR UNITED STATES OF AMERICA VETERANS
AND THOSE WHO HAVE DIED? PAINT THE
INTERIOR WITH SPECIAL thick epoxy ?
How about placing that special seal
material STUCK with super glue or even
use tap screws to hold it in place when
the unit is lowered over the RUNAWAY
FLANGE ? Would that stay and seal so
the ROV does not have to pull anything
through the Gas, Oil and Water pushing
up like a runaway OIL WELL ?
URGENT ATTENTION --- The BOP
manufacturer MUST have Plan C on getting
Hydraulic lines to fit up and feed
hydraulic OIL into the BOP from the
surface so as before 5000 feet of
hydraulic lines can be tied by even
plastic cuff material if not metal clips
to the riser outer flotation body
allowing recharging of the BOP hydraulic
system, replacement of the bad module
and if ALL ELSE FAILS and people still
can see with the Oil Fumes and Oil in
the Air, someone can actually READ the
BOP manual and find another way to close
down this 8 story wonder. My money
would be on the Branko R. Babic FLANGE
SEAL COUNTER PRESSURE PLUG MACHINED
SLEEVE OVER THE BOP FLANGE as when you
look….the circular valve will allow any
ROV to TURN RIGHTY TIGHTY and shut down
the flow of everything.
I
woke up last night with the vision of
the new Branko R. Babic Counter Pressure
Plug using a sleeve over that flange and
KNOW from experience as a Licensed
Contractor in Florida it will not only
work but guarantee success 100 PERCENT
! NO LEAKS ! BP able to recover the
OIL, GAS and WATER provided they use
super flotation GE RISER PIPE with
shutoffs. Did you find the GOLF BALLS
and RUBBER put into a pressure push item
Rear Admiral Landry ? ONCE THIS IS
SEALED PLEASE GET THE ROV’S LOOKING FOR
THOSE MISSING 11 MEN ON THE BOTTOM !
Roger that and good morning from America
Mr. Babic !
My
use of your FREE GIFT OF THE 1991
PATENTED CPP now with pipe was to allow
a SLEEVE made of solid metal machined
and drilled to allow the RISER FLANGE
SURFACE which is about 2 inches from
edge all around on the first flange to
be sealed using what we seal super big
flanges here in backflow assemblies.
Think for a moment about installing this
item right now stopping the leak since
the people cutting ruined your flange
riser.
I
have asked the President to restrict
future CASINGS to having a shutoff valve
on up section of Casing then on outlet
90 degree section attached then to a BOP
and top of BOP to use another flanged 90
degree ell with shutoff. Such would
allow FULL SHUTDOWN TEMPORARILY AND
REPLACEMENT OF BOP IMMEDIATELY IF IT
FAILED ….THEY WILL HAVE TO TAKE THE
PRESENT BOP APART TO FORENSICALLY
DETERMINE THE TRUTH THAT SOMEONE KILLED
THE ANNULAR AND MODULES FAILED PLUS
HYDRAULIC FLUID WENT OUT INTO THE SEA
BECAUSE NO CHECK VALVES ARE INSIDE THE
ENTIRE BOP OR LINES TO THE
SURFACE…….even that is stupid
considering the size and price. 8 story
tall unit on sea floor with potential
earthquake to destroy the planet with
oil and gas uncontrollably makes no
sense !
Will
you agree the special SEAL discussed in
DEFCON 5 and MAYDAY TWELVE will work
using your invention with only a SLEEVE
over the BOP flange ?
Here is Ruth's
and Ralph’s SEAL AT THE
FLANGE OVER THE BOP
modification to Branko
R. Babic Counter
Pressure Plug which will
work.
NOW URGENTLY NEEDED INFORMATION. EXACT MEASUREMENTS OF THE TOP
FLANGE ON THE BOP
SHOWING SIZE OF NUTS,
BOLTS, ATTACHMENT
CLEARANCE AND TOTAL
SPACE FROM 1 TO 3 INCHES
FOR MATCHING UP MACHINED
OBJECT.

Think of the item machined resembling the socket unit above with the
square one half or one
inch drive actually
being a 21 inch riser
protruding some 8 feet
tall.
Machined area thick wall perhaps 4 or 5 inches thick must go over the
top flange of the BOP
with the damaged RISER.
Up inside some 34 inches
you will cut or machine
A SPECIAL LEDGE for the flange surface to match with the interior
machined ledge sealing
perfectly the top of the
BOP ON THE FIRST
FLANGE. Down from that
first flange the area
will be machined
allowing all of this
unit to fit over the
second flange where
holes are drilled all
around that section and
super thick bolt tap
made to allow super
thick bolts with nuts or
TEE sections to close
them down on the second
flange quickly keeping
it from being pulled OFF
the second flange.
In the machined special 2 or 3 inch seal on the flange top for flange
number one you can
attach a special
material which will
either be manually set
over the spewing oil and
gas damaged riser to sit
down perfectly on the
small sealing area and
receive the SLEEVE with
super heavy weight plus
shutoff and flange to
connect to the surface
risers which should ONLY
be flotation sections.
Once the unit is set down and locked down with the bolts having the
21 inch riser and
weights already welded
on the top section of
the item figured above,
the valve for shutoff
can be partially closed
to allow small
restriction pressure as
it is attached to the
SURFACE RISER which at
the TOP 200 feet should
have another wheeled
shutoff valve for
emergency use. What you
do with the oil and gas
coming up to the tanker
is your business but at
least ALL OIL LEAKS WILL
BE STOPPED IMMEDIATELY !
Brad: Please see if you can make an illustration showing machining
necessary to make the
fit over the flange
perfect yet allowing 1
inch or more free area
for the second flange
which might not be
perfectly joined like
the top one…maybe one
inch or two inches all
around would suffice.
Branko: Will see if UNCLE, USCG OR OUR PRESIDENT can get you the
exact circumference of
the flange and exact
distance which would
seal but give me 1 to 2
inches and I would be
extremely confident it
will work. IF the ROV
can pass a claw
vertically opened
through the billowing
oil then that same claw
can hold a 2 inch wide
special sealer like we
use in Underground
Utility FLANGE
connections to set over
the flange and be
protecting the edge to 2
inches to receive the
machined Branko R. Babic
TOP HAT Counter Pressure
Plug system now that
someone screwed up the
riser and will not get a
new flange to use.
MAYBE those same people
can get the exact
figures needed to allow
a 1/16th slip
of the CAP with specific
number of inches over
top and edge down to the
open space before second
flange starts which
might be ODD shaped or
off direct center as the
bolts could have moved
it over so 1 half to 1
inch play would be
needed on the bottom
section of the BRANKO R.
BABIC COUNTER PRESSURE
CAP PLUG….. I Still
think this man in
England needs to be
KNIGHTED BY THE QUEEN
FOR HIS GIFT TO AMERICA
AND THE WORLD ! SIR
BABIC has a nice ring to
it !
|
Mr. President: CAN YOU ORDER CAMERON AND BP TO
GIVE YOU THE EXACT DIMENSIONS NEEDED FOR
THE FLANGE
AND ORDER THEM TO RELEASE THE BOP MANUAL FOR
REVIEW AS
SOMETHING IS REALLY ODD ABOUT HAVING
THESE 8 STORY ITEMS ON THE SEA BED TIED
TO THE CASINGS WITH A FLANGE HAVING NO
SHUTOFFS AND OUT OF THE TOP IS A RISER
WHEN THE BOP SHOULD HAVE A FLANGE THEN
TEE THEN FLANGES UP AND DOWN AND
SIDEWAYS THEN THE BOP LAID OVER ON THE
SEA BED AND A 90 WITH SHUTOFF THEN
FLANGE GOING UP TO THE SURFACE IN
FLOTATION RISER MATERIALS. SUCH WOULD
ALLOW SHUTTING OFF THE FLOW OF OIL AND
GAS THEN UNHOOKING AND LIFTING THE BOP
OUT OF THE SEA BED AND UP TO THE SURFACE
TO REPLACE SAME AND FORENSIC ANALYSIS OF
WHAT REALLY HAPPENED TO CAUSE THIS
DISASTER IN THE FIRST PLACE. PLEASE SEND
THE CRITICAL SPECIFICATIONS AND
MEASUREMENTS IMMEDIATELY TO BRANKO R.
BABIC, BRAD WEHDE IMMEDIATELY SO
DRAWINGS CAN BE MADE SHOWING YOUR GENIUS
ENGINEERS WHAT SHOULD BE DONE
IMMEDIATELY AND THE DAMNED LEAK CAN….CAN
BE SEALED IN 8 HOURS TIME USING THE
TECHNIQUE AND NOT THE HAIL MARY PALE
OVER SPILL AND IT WILL GO AWAY DREAMS OF
BP STALLING FOR TIME !!!!
|
WILLING TO BET THERE ARE MORE THAN 100 RIGS IN THE GULF FACING THE
SAME PROBLEMS CREATING A
WORLDWIDE DISASTER IF THEY FALL
OVER IN AN EARTHQUAKE OR
TERRORIST ATTACK LET ALONE
STUPIDITY OR FAILURE TO ACT WHEN
THE USERS OR OWNERS KNOW THEY
HAVE A MONUMENTAL PROBLEM NOT
REPORTING SAME TO UNCLE
INSPECTORS ?
P.S. Did your physical plant people have you
remove the Faucet Aerators on
kitchen and bathroom sinks plus
run water chlorinated all
throughout the Whitehouse,
especially rooms not used for
weeks on end. The chlorine
leaves the stagnant lines and
bacteria takes over. Same
applies to CAMP DAVID and your
children’s schools which will
close down in a few weeks for
perhaps two months….NUM NUM
BACTERIA GUMBO ! All ships,
submarines, bases, buildings,
rental units, motels, hotels,
retreats and special camps are
contaminated with super bacteria
killing our young and old.
Whitehouse and Camp David should
run the water every four days
with chlorinated water and
DECONTAMINATE THOSE AERATORS
everywhere every 30 days with
soaking them in pure chlorine
bleach as what I use can kill !
DAY 46 OF DESTROY AMERICA, GULF AND EAST COAST.
Thanks. You should look at the file we posted just a few minutes ago
which also went to the PRIME
MINISTER AT 10 DOWNING.
Site to look at all files is still
http://www.scribd.com/ralphwhitleysr
for those who are interested.
SO FAR NO ONE HAS CONTACTED ME,
ANYONE I KNOW OR EVEN BRANKO R.
BABIC IN ENGLAND !
WE NEED THE SPECS ON THE BOP TOP FLAGE TO GIVE YOU A BETTER PICTURE THAT
ALL WILL UNDERSTAND MR.
PRESIDENT.
Brad can make up a drawing as he is a Genius with his own Hydraulic
Reamer and SEAT which would
have done the trick shutting
down the well.
Branko R. Babic in Oxford is fully aware of the fact that with the
proper measurements provided on
the BOP FLANGE the Counter
Pressure Plug with weight and
shutoff plus flange to draw off
items to the surface can be
fitted to the top of Flange ONE
which BP nor anyone else has
ever called to see how EXPERTS
would seal it if they do not
want to take the old flange OFF
and put a new machined one on
with riser and shutoff.
Professionals do this EVERY MONTH somewhere in Florida utility groups.
ASK THE PROFESSIONALS !
Better have the U.S. COAST GUARD AND NAVY SEAL OFF THE GULF AS ANY
TERRORIST REALLY KNOWS NOW HOW
TO TAKE AMERICA AND ALL OTHER
NATIONS TO THEIR KNEES……MAKE TWO
OR THREE MORE LEAKS AS YOU
CANNOT SEE WHAT US PROFESSIONALS
KNOW WILL SEAL THIS WELL…..LET
ALONE TWO OR THREE MORE.
Oh….I forgot….those INSPECTORS
were too busy partying rather
and really inspecting and they
had no idea those 8 story BOP
items were on a 36 inch casing
and could be forced over but NOT
SHUT DOWN OR CHANGED !
Now that really gives everyone confidence…..why no LAWS on making these
items safe with shutoffs on all
three sides of tees, attach BOP
on horizontal part of tee
leaving a part with shutoff
going UP toward surface then lay
down the BOP attach to the
Horizontal SHUTOFF FLANGE then
once laying down attach a 90
degree ell to the top flange of
the BOP facing UP to surface
then attach another SHUTOFF and
a flange for make-up to super
flotation risers…..who missed
this critical item surfacing now
that WE in the public can see
how OIL RIGS AND OIL COMPANIES
CUT CORNERS opening AMERICA AND
THE WORLD TO A DISASTER WHICH
CANNOT BE CONTROLLED SHOULD AN
EARTHQUAKE HIT THE GULF AND TURN
THESE 8 STORY ITEMS SPLITTING
CASINGS ON THEIR SIDES LIKE
DOMINO’S AND NO ONE CAN SHUT
THEM DOWN UNLESS THEY HAVE THE
BRANKO R. BABIC FRICTION PLUG
MADE DROPPED INTO THE CASINGS IF
YOU ARE LUCKY BUT MORE DAMAGED
BOP RISERS AND YOU WILL LET BP
COME WITH THE SOMBRERO OR TOP
HAT FOUR OR FIVE TIMES AND THE
NEW GENIUS IDEA RATHER THAN
USING THE SLEEVE MACHINED LIKE
THE SOCKET WITH WEIGHTS AND
PIPE….ALL MADE IN 8 HOURS FLAT
IN A GOOD WELDING AND MACHINE
SHOP ….BUT WHAT SPECS HOW WAS
THE FLANGE DESIGNED AND WHAT
SURFACE ON TOP IS AVAILABLE TO
MACHINE A SPECIAL SEAL OVER SAME
AND A SPECIAL SEAL OVER THE
FLANGE EXTENDING THICK SLEEVE
CUT ALLOWING ONE TO GO OVER THE
SECOND FLANGE WITH NO PROBLEMS
PLUS MULTIPLE SUPER HEAVY BOLTS
THREADED THROUGH THE 5 OR 8 INCH
SIDES OF THE SLEEVE MACHINED !
PAINT ONLY RED WHITE AND BLUE IF IN AMERICA……MIGHT PAINT GREEN IF
IRELAND OR DIFFERENT IF
ENGLAND……..GET THE IDEA…..PLEASE
GET BRANKO R. BABIC, BRAD WEHDE
AND THAT STUPID OLD VETERAN
‘PLUMBING CONTRACTOR/VETERAN”
THE SPECS THEN TALK TO SOME
SUPER MACHINISTS AND UTILITY
WORKERS IN WASHINGTON D.C., NEW
ORLEANS OR EVEN FLORIDA,
HILLSBOROUGH COUNTY….THOSE
NON-BP CHOSEN EXPERTS THAT WORK
WITH THESE FLANGES EVERY DAY
EVERY YEAR !
I KNOW IT WILL SEAL AND UNLIKE THE ONE ON CNN…..NO FLOW WILL COME OUT
UNDERNEATH….SADLY WE KNEW THIS
COULD BE SOLVED IN 8 HOURS SINCE
042610 ! SENDING REPEATED
MESSAGES TO YOUR OFFICE GETS IT
READ BY WHOM ?
NO DIRECT CONTACT WITH REAR ADMIRAL LANDRY, ADMIRAL THAD ALLEN,
GOVERNORS OR LEADERS EVEN IN MY
OWN STATE !
46 DAYS AND COUNTING !!!! GO TO THE MOON IF MORE BREAK ACROSS THIS
PLANET !
Ruth DeLaMater Bundy and Ralph Charles Whitley, Sr.
Backflow Prevention, Inc. CFC032631
4532 W. Kennedy Blvd. PMB-276
Tampa, Florida 33609-2042 USA
Phone: 813-286-2333
SKYPE ralphwhitleysr
Backflow2@verizon.net
060410 @ 2:50 PM
From: ATT_srm270 [mailto:srm270@att.net]
Sent: Friday,
June 04, 2010 2:08 PM
To: Brad Wehde
Cc: Ralph C.
Whitley Sr.
Subject: Re: OIL
DISASTER DEFCON 5 (srm
reply1)
Has anyone got back in
contact with you...or
responded?
I did forward you material
to an engineer (former) at
Oak Ridge National Labs...to
get your solution in front
of them...hopefully through
their contacts to Deepwater
BP command.
Just know that was done. I
have put your proposal
in front of the people I know
who might assist to get to
someone's attention...to
contact you directly. Same
for Ralph's solution - will
get that to review as well,
if i have any opportunity to
do it.
So....just know - I see your
solution, and will do
everything I can to get it
to any responsible persons I
know....ok? count on that.
I do not favor an
"solution"...whatever works,
fastest, highest chance of
success, least risk of
making it worse....I for
THAT ONE...ok? :)
Keep me informed. About
98% of the people I've
spoken with....just short
circuit....blank-out. They
just don't get it...they
react like Im asking, "What's
on the menu/Pizza
selections"...that kind of
attitude/ no sense of
'urgency'...or that it
particularly matters.
Everyone thinks someone else
is handling it...so they ALL
pass the buck...around in
circles.
At 59...i can't believe that
so many people...could be so
unconcerned...like they are
already 'dead' inside. and
just faking 'outside'.. Im
only mentioning here...in
case you have been
experiencing the same(?)...
So with that...please keep
me posted.
best ...thanks for all
you've done Brad...to follow
it thru..and get is
solved. If i do get
through....your stuff goes
right in front of
them....and I have my own
approach, but cannot get
the basic information to
'compute solution'
(literally - "fastest time
to solution"...to STOP it.
(I have 3 methods /
strategies of approach)
steve
OUTSTANDING:
DAY 46 and someone actually
responded to a news tip to
go the
http://www.scribd.com/ralphwhitleysr
web site.
WE ARE ONE MORE FULL LEAK
AWAY FROM AN INTERNATIONAL
DISASTER AND THE FULL LEAK
CAN BE STOPPED WITHIN 8
HOURS USING THE BRANKO R.
BABIC COUNTER PRESSURE PLUG
SEALING WITH A SPECIAL
MACHINED THICK SLEEVE, FLOW
THRU PIPE WITH WEIGHTS
WELDED PERHAPS 8 FOOT TALL,
SHUTOFF WITH WHEEL, FLANGE
TO SURFACE AND HOOKING 21
INCH FULL RISER TO THE
SURFACE VESSEL.
SUCH WILL BUY TIME TO ALLOW
BP REMOVAL AND REPLACEMENT
LATER !
INTERNATIONAL DISASTER ONLY
ONE LEAKING WELL HEAD OR BOP
UNCONTROLLED LEAK AHEAD !
HEY MR. PRESIDENT…..WE HAVE
THE SOLUTION WHICH WILL WORK
EVEN IN THIS INSTANCE USING
THE 2 INCH OR 3 INCH SEAL
SURFACE ON THE BOP UPPER
FLANGE WITH A MACHINED
SLEEVE SUPER HEAVY WITH
SPECIFIC MEASUREMENTS TO
MAKE IT UP AND ANY MACHINE
SHOP AND WELDING SHOP CAN
HAVE IT READY WITHIN 8 HOURS
PLUS YOU CAN LOWER DOWN TO
THE BOP MOVING THE CUTE
‘SOMBRERO 4 FAILURE’ STOP
THE LEAK AND PASS THE FLUIDS
AND GAS TO THE SURFACE.
THEN YOU CAN FIND THE BODIES
AND LET BP CLEAN UP THE GULF
SEA BED BRINGING THE
EVIDENCE TO THE SURFACE FOR
REVIEW, MOVING THE RIG TO
SHALLOW WATER FOR
INVESTIGATION AND FINALLY
THESE OTHER PEOPLE TRYING TO
HIT THE 7 INCH PIPE GOING
INTO THE OIL MIGHT BETTER
PICK A LARGER CASING
LOCATION KNOWN TO MAKE THAT
WET TAP AND FORCE MUD OR
ANYTHING ELSE UP TO SEAL THE
BOP BOTTOM FLANGE. MAKE
SURE THEY REPLACE THE BOTTOM
FLANGE WITH A FLANGED
SHUTOFF, TEE PLUS TWO OTHER
FLANGE SHUTOFFS THEN LAY THE
REPLACEMENT BOP ON THE SEA
BED AND PROVIDE A 90 DEGREE
ELL OUT OF THE BOP TOP TO
THE SURFACE AFTER INSTALLING
ANOTHER SHUTOFF. ALL
HYDRAULIC AND LINES FOR
CHOKE OR KILL VALVE SHOULD
BE INDEPENDENT WITH
HYDRAULIC LINES HAVING CHECK
VALVES INSTALLED AT THE
FACTORY INSIDE THE BOP OR AT
LEAST IN THE RISER SECTIONS
WITH PIPE TIED OR HELD ON TO
THE ‘SUPER FLOTATION RISER’
ALL THE WAY TO THE SURFACE
CONTACT POINTS WHERE IT CAN
BE SEALED AND UNHOOKED TO
COME BACK LATER AND JOIN
SAME WITH ANOTHER SHIP OR
RIG.
Ralph Charles Whitley, Sr.
060410 2 4:35 PM Eastern
Ralph
Sad fact. BP CEO spent some
$50 MILLION on newspaper ads
apologizing for the spill.
He also gave investors $10.5
BILLION in returns on the
stock perhaps. According to
President Obama in his news
conference at the LA scene
today SECOND VISIT.
CEO Hayward could have spent
about $8,000.00 dollars on
042610 PLUS EVERY DAY THE
OPPORTUNITY IS THERE STILL
saving the GULF and
creatures from the spill but
instead he brought the
famous SOMBRERO technology
and still has not given any
specifications for the BOP
top flange so others can
tell him how to seal his toy
BOP and draw ALL oil and Gas
to the surface ships. Some
21 MILLION GALLONS OF OIL
SPILLED INTO THE GULF NOT
COLLECTED TO DATE WITH MORE
TO COME UNTIL DECEMBER ?
Gee…..let us see…..spend
$8,000.00 and do this or
spend over $300 MILLION plus
loose how many MILLIONS all
over the world and cause how
much damage which will have
to be PAID ! Gee….hard
choices. I cannot even get
FIVE MINUTES WORTH OF A
TELEPHONE CALL OR SKYPE CALL
FROM THIS BP CEO ! My
SKYPE NAME IS
ralphwhitleysr call and we
can go online with a
conference call perhaps from
anywhere. No plane tickets,
no drivers, no hotels, no
motels, no military
aircraft….just a phone !
TAPE IT and then check with
the machine shops and local
County or City utility
workers in the Water and
Sewer Department as they
PLAY WITH THIS MANY TIMES A
YEAR ! Same plan sealing a
super leak !
Mr. President. Not even YOU
have made a call when it is
obvious….painfully OBVIOUS
that the Branko R. Babic
Counter Pressure Plug works
on FLANGE SURFACES with a
little machining of the
SLEEVE SUPER THICK AREA plus
welding thick 21 inch riser
pipe, weights and round
wheel shutoff gate valve
plus flange matching GE
FLOTATION PIPE TO THE
SURFACE ……… Are you really
DELETING MESSAGES FOLKS ?
WE ARE ONE ADDITIONAL SPILL
AWAY FROM AN INTERNATIONAL
DISASTER CLOSING DOWN
AMERICA AND ISLANDS TO THE
SOUTH ! INTERNATIONAL
DISASTER ! America will
have to spend BILLIONS UPON
BILLIONS unless someone
reviews the information made
available, sends down
inspectors into ship ROV
command centers to look at
ALL RIGS no doubt only one
slip up away from destroying
America and more Nations
than you will ever desire to
see with a MASSIVE OIL SPILL
AND AS THEY SAY ----- YOU
CAN’T HANDLE THE TRUTH LET
ALONE THE SPILL FOLKS SO GET
BP CEO TONY HAYWARD TO MAKE
THAT CALL PLEASE. It is a
criminal act to mislead the
President or any Government
Official ! I would look
lousy in ORANGE !
Folks. Four special people
including INVENTORS have
been trying to contact TONY
HAYWARD, not for a job, not
for bidding on anything but
to really provide a
foolproof proven method to
shut down the well leaks at
the BOP and allow 21 inch
riser to fill up the surface
ships with oil and burning
off of dangerous GAS within
8 hours. Same information
was tried to be delivered
since 042610 and no one
responded..
Such
has been the GOAL since
042610 and more than one
clear picture has been
painted but still no direct
response from BP CEO TONY
HAYWARD the only person on
the Planet who could perhaps
understand what is being
suggested and how STUPIDLY
SIMPLE the solution really
is with anyone who has been
around super large flanges
and lines at any time like
he reportedly learned on.
I
have provided FREE SKYPE
ACCOUNT NAME ralphwhitleysr
for not costing anything to
call on a computer PLUS my
home office telephone at
813-286-2333 plus files are
stored on
http://www.scribd.com/ralphwhitleysr
available even to the Prime
Minister at 10 Downing
Street in London.
CAN
ANYONE ON THIS LIST ADVISE
MR. TONY HAYWARD THAT FOUR
SPECIAL PEOPLE HAVE HAD THE
SOLUTIONS WHICH TAKE ONLY 8
HOURS FLAT TO SHUT DOWN THE
LEAKS AND GIVE BP SHIPS ALL
OF THE OIL……..A SIMPLE CALL
OR A SIMPLE SKYPE
COMMUNICATION BECAUSE NO ONE
WILL SHARE THE FLANGE
MANUFACTURERS INFORMATION
AND SO FAR MR. HAYWARD HAS
SPENT OVER $50 MILLION
DOLLARS ON ADDS TO APOLOGIZE
WHILE AMERICA AND THE GULF
COAST, ESPECIALLY FLORIDA
AND EVEN THE ISLANDS ARE
INVOLVED WITH THIS 46 DAY NO
COMMUNICATION WITH THE CEO.
Thanks. Please make the call
Mr. Hayward and provide via
internet the Cameron BOP
flange information precise
so that you can be shown
quickly how to seal the leak
and recover everything. I
have known this information
for more than 30 years and
helped PEMEX with an idea
that stopped IXTOC 1 in
1979.
Ralph
060410 @ 6:57 PM Eastern
June 6, 2010
What you observed earlier last week was the REPORTING TO THE FBI, DOJ,
HCSO and Governors of a
FELONY ACT. It is not quite
too easy to be the only
person asking for an
immediate criminal
investigation as well as
having the USCG and U.S.
Navy take over with
Governors providing Special
Contractors within the
County, State or Municipal
Government fully capable of
replacing the FLANGE, MAKING
A SHUTOFF THEN ON THE
OUTGOING SIDE MAKING UP THE
FLANGE TO TAKE A NEW 21 INCH
RISER TO THE SURFACE.
Keep in mind the entire problem is ALL BOP’S IN THE GULF are standing up
when they should be
installed lying down but
first the CASING attached to
a SHUTOFF then TEE FULL FLOW
UP and 90 DEGREE ELL WITH
SHUTOFFS ON ALL SECTIONS OF
TEE. BOP COULD THEN BE
MATCHED UP WITH THE
HORIZONTAL TEE SHUTOFF THEN
BOP LAID DOWN ON THE SEA BED
AND BOP AT THE TOP HAS A
FLANGE ATTACHED TO 90 DEGREE
ELL WITH FLANGES THEN
SHUTOFF GOING TOWARD
FLOTATION RISER THEN FLANGE
TOWARD RISER IS ATTACHED AND
YOU ARE READY TO WORK.
In case of emergency or total failure you only shut off two shutoffs,
unhook the entire BOP,
remove BOP and set down new
one then open the inlet
shutoff powering BOP and
open the 90 degree ell
shutoff sending all material
to the SURFACE in that
FLOTATION RISER.
Right this very minute, with a gash horizontal right side in the riser
damaged will not let any of
the TOP HAT contact same
thus you have a tremendous
amount of gas, oil and
dreams spewing
uncontrollably into the
Gulf, Much worse than you
had with the TOP HAT NOT
THERE PERHAPS as trying to
be CUTE the so called
experts restricted the 21
inch flow down to perhaps 6
inches which is CRIMINAL as
18 inches are pushed back
into the Gulf. WHY IN HELL
THEY DID NOT HAVE A 36 INCH
RISER slipped down over the
34 or even 32 inch FLANGE
surface is beyond me
Professionally. Such
appears CRIMINAL !
The KEY now is more and more people calling on the President to STOP
THIS LEAK BY ALLOWING TRUE
PROFESSIONALS TO COME IN
QUICKLY AND MANUFACTURERS OF
BOP FLANGE TO GIVE THE
GOVERNMENT ANOTHER WITH
BOLTS AND EXTERNAL
CONNECTORS FOR MUD AND
HYDRAULIC LINES WITH CHECK
VALVES FOR HYDRAULIC LINES
THEN ALL CAN BE STRAPPED TO
THE 21 INCH FLOTATION RISER
TO THE SURFACE. BOLTS
LOCKED DOWN ON THE SECOND
FLANGE BY A MACHINED SURFACE
TIGHT WITH THE FIRST FLANGE
AND SEALING ON THE 2 OR 3
INCH MACHINED SURFACE IF
THEY DO NOT WANT TO CHANGE
THAT FLANGE…..THAT IS REALLY
ODD !
ONCE THEY CHANGE THE FLANGE WITH NEW RISER THEY COULD HAVE ALL LINES IN
FLOTATION RISER WITH NEW
HYDRAULIC LINE WITH CHECK
VALVE THEN ALL LEAKS WOULD
BE INSTANTLY STOPPED. BP
DOES NOT WANT TO STOP THIS
LEAK AS IT COULD HAVE BEEN
STOPPED ON 042610 SO TO ME
THEY ARE TERRORISTS CREATING
A NATIONAL EMERGENCY WHICH
MAY GO INTERNATIONAL ON THE
GULF STREAMS TO OVERSEAS
CURRENTS KILLING ALL SEA
LIFE IN THE GULF, EAST COAST
AND ISLANDS THEN REALLY
DAMAGING THE PLANTS SUCH AS
DESALINATION PLANT SOUTH ON
41 FROM TAMPA….THAT HAS TO
SHUT DOWN PERIOD !
MILLIONS UPON MILLIONS LOST
BUT MILLIONS PAID TO KIDS,
ADULTS AND MILITARY TRYING
TO PICK UP OIL AND BLOBS
WHEN THERE SHOULD HAVE BEEN
NONE USING THE BRANKO
RICHARD BABIC COUNTER
PRESSURE PLUG OVER FLANGE OR
BETTER YET THE STUPID RALPH
CHARLES WHITLEY SR. IDEA TO
REPLACE THE FLANGE ON TOP OF
THE BOP.
REPLACE THE FLANGE ON TOP OF
THE BOP COST WHAT MAXIMUM
? $20,0000.00 AND THEY ARE
SPENDING WELL OVER 350
MILLION PLUS. PRESIDENT
MAY SMILE AT ALL OF THOSE
CITIZENS AND IMMIGRANTS
WORKING ON THE SHIPS, BOATS,
OIL CLEANUP AND BEACHES AS
BEING NEW EMPLOYMENT……AT
WHAT COST ……SO AMERICA CAN
SEE THE SEA CREATURES AND
CORAL REEFS DIE PLUS THOSE
WORKING MAY DIE FROM
EXPOSURE TO THE CONTAMINATED
SOLVENTS SPRAYED AND IN THE
WATER….OR THE OIL FUMES OR
THE GAS FUMES…… GREAT WAY TO
DESTROY AMERICA FOR THE NEXT
TWENTY YEARS.
NOW WHAT IS REALLY SCARY IS THIS IS ONLY ONE PROBLEM……WHAT IF ANOTHER
RIG STARTS LEAKING OR IF IT
BLOWS WHEN THEY TRY TO DRILL
INTO THE RISER.
INTERNATIONAL DISASTER
UNRECOVERABLE !
I TOLD A LADY TO DROP A STEEL UMBRELLA INTO THE CASING TO THE AREA WHERE
THE OIL IS LOCATED ALLOW THE
STEEL TO OPEN AND THEN PULL
IT TIGHT AGAINST THE 7
INCHES IN THE OIL SEALING
THE WELL PERMANENTLY.
I cannot print what she recommended I do with the umbrella to test it
out !
PLEASE send the FBI and President Obama a signed e-mail requesting the
immediate arrest of BP CEO
Tony Hayward for this Attack
against America and possible
murder of 11 men on the
Deepwater Horizon.
Petition also in the letter
that the President step in
immediately with full
backing for NATIONAL
DISASTER/EMERGENCY/SECURITY
PURPOSES and take over FULLY
this entire operation
relieving even a RETIRED
ADMIRAL THAD ALLEN who for
reasons UNKNOWN daily wears
a U.S. Coast Guard FOUR STAR
ADMIRAL USCG UNIFORM AND
FLIGHT SUIT when he is
RETIRED. At least General
Honore understands HE WAS A
GENERAL but retirement
strips him of his right to
wear the ACTIVE DUTY UNIFORM
unless President Obama
BRINGS HIM BACK ON ACTIVE
DUTY.
I was a Colonel Grade 0-6 and member of the CIA-USA FLORIDA MILITIA FOR
YEARS….. perhaps I should
pull out my Bird Colonel
Wings black and silver and
put them on my old Uniforms
walking around town ……not
even retired…….Admiral Thad
Allen is WRONG UNLESS THE
PRESIDENT CALLS HIM BACK
INTO ACTIVE DUTY STATUS that
is why we send messages ONLY
to Rear Admiral Landry who
is active duty USCG.
IF Thad Allen, USCG ADMIRAL RETIRED plus Rear Admiral Landry cannot see
the films of the HORIZONTAL
CUT ON THAT RISER JUST ABOVE
THE BOLTS ON THE FLANGE
WHICH IS NOT SEALED….THEY
NEED BETTER ADVISERS AND
GLASSES. It will not stop
for months and months.
British Islands do not
suffer…..AMERICA suffers
plus all islands South may
suffer.
We in Florida who work in
these Professions licensed
by the State and Certified
by the State COULD HAVE
SEALED EVEN THIS FIASCO LEAK
IN 8 HOURS FROM 040610 USING
THE BRANKO R. BABIC
INVENTION COUNTER PRESSURE
PLUT. I can still seal it
totally TODAY IN 8 HOURS
with access to a machine
shop for perhaps six to 8
hours making up the SUPER
THICK SLEEVE SEALING OVER
BOTH FLANGES WITH PRIMARY
SEAL 2-3 INCHES OVER TOP
FLANGE SURFACE AND HAVING 21
INCH PIPE, WEIGHTS, SHUTOFF
AND FLANGE TO CONNECT WITH
SURFACE FLOTATION RISER
PIPE. NO LEAKS or we can
replace the entire FLANGE
with a NEW ONE then have
those cute Mud and Hydraulic
Lines EXTERNAL with shutoff
valve to flanges and
hydraulic routed EXTERNAL to
surface tied off to
FLOTATION RISER if necessary
to see if the hydraulic
pressurized unit would allow
shutting off the BOP.
Remember…… ALL BOP UNITS, OF WHICH THERE ARE OVER 200 IN THE GULF ALONE
should be laying down with
shutoff on flange with tee
on up side of shutoff and
shutoff on each outlet with
horizontal outlet attached
to a BOP with BOP top flange
attached to a 90 DEGREE ELL
with shutoff to riser but
that independent HYDRAULIC
LINE must have check valves
to keep hydraulic fluid
inside the BOP and inside
the riser hydraulic line or
you go back to the same
DANGEROUS condition observed
right this minute.
AGAIN --- GIVE ME AND SOME EXPERT MACHINISTS A NEW
FLANGE, 90 DEGREE ELL WITH
SHUTOFF, RISER 21 INCHES
AFTER ANOTHER 90 DEGREE ELL
IS ATTACHED TO TAKE THIS
RIGHT NOW TO THE SURFACE AND
GUESS HOW MUCH OIL AND GAS
WILL BE GOING INTO THE GULF
AFTER INSTALLATION………. Z E R
O GALLONS ! Time 8
hours after it is made up
and ready to install. Those
ROV units can unscrew the
BOLTS EXACTLY AS SHOWN ON
TAPES FROM TOP THEN FROM
DOWN UNDER FOR AREAS THAT
HAVE TO HAVE CLEARANCE. ALL
DONE UNDER PRESSURE WHICH
WILL BE MINIMAL WITH OPEN
AREAS AT LEAST THROUGH THE
90’S WITH SHUTOFF THEN TURN
THE SHUTOFF BACK DOWN JUST A
LITTLE AND JOIN THE RISER
WITH A SHUTOFF ON SAME AND
OPEN UP THE VALVES THEN SEE
IT GO UP TO THE SURFACE.
REMEMBER ---- RISER MUST
HAVE WATERPROOF COVER ON THE
WAY DOWN AND SEALED OFF FROM
SURFACE TO BOTTOM UNTIL
READY TO ATTACH THEN YOU
ATTACH THE RISER, OPEN UP
THE MAIN SHUTOFF AND OPEN UP
THE RISER SHUTOFF THEN UP
GOES THE OIL, GAS AND WATER
INSIDE THAT SMALL SPACE
BETWEEN FLANGE AND
SHUTOFF….NO ICE….NO
PROBLEM. CHECK WITH THE
EXPERTS….IT WILL AND CAN
WORK IMMEDIATELY !
BALL IN YOUR COURT OVER THE NET MR. PRESIDENT ! LET THE FBI GET BP CEO
TONY HAYWARD AND START THE
CRIMINAL INVESTIGATION BUT
HAVE THE NAVY AND USCG TAKE
OVER EVERYTHING GETTING THAT
NEW FLANGE FOR TOP OF THE
BOP AS THERE ARE MANY OUT
THERE…..GET MY THOUGHTS TO
THE MACHINE SHOP FOR SHUTOFF
AND TWIN 90 DEGREE ELLS WITH
SHUTOFFS AND FLOTATION RISER
WITH SHUTOFFS TOP AND BOTTOM
CONNECTION PLUS REMEMBER TO
SEAL THE RISER PIPE UNTIL
YOU TURN ON THE BOP SHUTOFF
GETTING PRESSURE REDUCED
THEN OPEN THE RISER SHUTOFF
AND TOP SHUTOFF AT THE SAME
TIME AND WATCH THE NEW STRAW
PUSH EVERYTHING TO THE
SURFACE WITH NO LEAKS…….. NO
LEAKS !
When the President sees this
simple method and does same
with the Military plus
Government Utility Foremen,
then we can tell him and
USCG Rear Admiral Landry how
to suck up the blobs of oil
down 1,000 feet and skim all
shallows from LA to the keys
as that is also known and
works every time….ask ROTO
ROOTER OWNERS. The ROTO
ROOTER VACTOR TRUCKS CAN
SUCK UP ANYTHING WHEN ON A
BARGE LINED UP LIKE TWO
KINGS WITH A 12 OR MORE INCH
SKIMMER. Imagine what they
can do with SUMP PUMPS IN
GLOBS OF OIL DEEP plus 1000
feet down with IRRIGATION
SUBMERSIBLE PIPE TO THE TOP
INTO BARGES WHERE THOSE
SPECIAL MATERIAL ROLLER
MATERIALS SOAK UP THE OIL,
FANS BLOW OFF THE WATER AND
ROLLERS SQUEEZE THE OIL INTO
BARGE AREAS TO BE PUMPED
INTO SUPER TANKERS. Or did
you miss the EPA PDF on how
to make the skimmers with
rollers ?
Those THOUSANDS of Americans
who donated HAIR to be put
into ladies hose like meat
into a tube for sausage
FORGET one can pull them up
into rollers squeezing out
the oil and return the item
to the water over and over
to get more oil until they
brake…but then there are of
course more sturdy material
which will allow the same
operation and pulling the
unit into that dustpan then
onto rollers folks. OR DID
YOU MISS THAT FLICK ALSO ?
|